We have been working for years on the design, engineering, fund-raising, and now finally, the installation of the beautiful new pedestrian bridge (stacking functions as a utility conduit as well)!
-
Recent Posts
- Grid Tied: Electrical Service Ugrade
- Geothermal Collection Reservoir
- Protected: ORC Manual
- Protected: Working Task List
- Geothermal Power Plant
- Straw Hall Hydronics
- Fire Prevention: Protocols & Actions
- WH Second Pour: Stem Wall
- CAMPING: Current Local Camping Options
- Water Tanks Maintenance
- Damn! …Those Dams
- Floor Care: Hydraulic Lime
- Western Pond Turtle
- Using Hot Water to Cool?
- TEG Electricity from Hot Water?
- Archive of Updates
- Power Line Relocation
- Articles of Incorporation
- Early Progress Made